An inner city mixed-used condominium development located in Pasong Tamo, Makati City. It is a 3-tower project with commercial areas at the ground floor and four levels of parking. Situated near major thoroughfares , it is easily accessible from the north and south via the South Superhighway and from east to west via Pasay Road. Within short distance to Greenbelt (800 meters
away), Makati CBD (1 km away), Don Bosco Technical Institute (30m away) and Makati Cinema Square (500m away).
The TREVI TOWERS - up to date design. An ideal environment brought about by efficient use of energy.
Cool Inner City Living...
The project amenities are located at the roof deck of the podium development.
Project amenities are...
Cool Inner City Living...
The project amenities are located at the roof deck of the podium development.
Project amenities are...
• Swimming pool
Floor Plans
The Trevi towers floor plans are designed for comfort and convenience. Footprints range from 20 sq. m. to 31 sq. m. for a single bedroom unit, 36 to 42 sq. m. for a 2 bedroom unit. All units come with balconies. Penthouse unit areas at 180 sq. m.
• Children's playground• Landscaped gardens
• Promenade
• Al fresco areas
• Promenade
• Al fresco areas
Floor Plans
The Trevi towers floor plans are designed for comfort and convenience. Footprints range from 20 sq. m. to 31 sq. m. for a single bedroom unit, 36 to 42 sq. m. for a 2 bedroom unit. All units come with balconies. Penthouse unit areas at 180 sq. m.
Vicinity Map
Price range for current available units left:
Studio - P2,100,000 / 21 sqm
1 Bedroom - P2,200,000 - P4,100,000 / 21 sqm - 35.18 sqm
Note: Combination for bigger units available.
(Commercial Units)
P3,400,000 - P10,500,000 / 26.94 sqm - 74.65 sqm
Studio - P2,100,000 / 21 sqm
1 Bedroom - P2,200,000 - P4,100,000 / 21 sqm - 35.18 sqm
Note: Combination for bigger units available.
(Commercial Units)
P3,400,000 - P10,500,000 / 26.94 sqm - 74.65 sqm
Sample Computation and Payment Options:
Address:
Pasong Tamo St., San Lorenzo Village, Makati City
Completion Date:
Tower 1 - December 2010
Tower 2 - December 2013
Tower 3 - 1st Half of 2014
Completion Date:
Tower 1 - December 2010
Tower 2 - December 2013